NVIDIA πΊπΈ
DoomBench currently associates 8 models and 49 evidence assessments with NVIDIA. Company attribution is separate from each model's version-specific risk score.
- Tracked models
- 8
- Evidence items
- 49
- Toward-doom share
- 4.8%
- Net index pressure
- +2.67
0 comments Β· 0 votes
Sign in to join the discussion β
No comments yet. Start the discussion.
Models from NVIDIA
Availability distinguishes public artifacts, proprietary hosted access, internal systems, and profiles whose current source evidence remains inconclusive.
| Model | Availability | Released | Doom Score |
|---|---|---|---|
| Nemotron 3.5 Lightning | Open | 11 Aug 2026 | 75.9 |
| NVIDIA Nemotron 3 Nano 30B A3B | Open | 15 Dec 2025 | 72.3 |
| Isaac GR00T N1 | Open | 18 Mar 2025 | 69.4 |
| Alpamayo 1 | Open | 05 Jan 2026 | 64.1 |
| Nemotron-4 340B Instruct | Open | 14 Jun 2024 | 51.2 |
| Nemotron-4 340B Base | Open | 14 Jun 2024 | 44.1 |
| NVIDIA Megatron 530B | Closed | 09 Nov 2021 | 33.5 |
| Nemotron-4 340B Reward | Open | 14 Jun 2024 | 30.9 |
Latest assessments involving NVIDIA
NVIDIA releases open Nemotron 3.5 Lightning for always-on agents
NVIDIA released Nemotron 3.5 Lightning, a 30-billion-parameter mixture-of-experts model with 3 billion active parameters, open weights, training data and recipes. The commercially usable model targets high-volume execution in long-running agents, runs on local hardware or data centers, and is distributed through open repositories, hosted APIs and cloud partners.
NVIDIA and six financial firms sign AI compute financing MOUs targeting $500 billion
NVIDIA signed memorandums of understanding with Apollo, BlackRock, Blackstone, Brookfield, Goldman Sachs, and KKR to create financing platforms intended to mobilize more than $500 billion for AI infrastructure used by frontier labs, enterprises, and AI clouds.
Anthropic secures SpaceXAI compute and raises Claude usage limits
Anthropic agreed to use all Colossus 1 capacity, adding more than 300 megawatts and 220,000 NVIDIA GPUs within a month while doubling Claude Code limits and raising API limits.
NVIDIA releases open Alpamayo 1 for reasoning-based autonomous driving
NVIDIA released Alpamayo 1 as an open vision-language-action model for autonomous vehicles, alongside simulation tools and datasets intended to accelerate Level 4 deployment roadmaps.
NVIDIA releases open Nemotron 3 Nano for scalable multi-agent systems
NVIDIA released a 30-billion-parameter hybrid model with 3 billion active parameters, open weights, and efficiency aimed at large multi-agent deployments.
GPT-5.2 launches for professional work and long-running agents
OpenAI released GPT-5.2 Instant, Thinking, and Pro across ChatGPT and APIs with stronger professional work, coding, long context, tool use, and multi-step agent performance.
Mistral Large 3 brings frontier-scale multimodal AI to open weights
Mistral AI released the 675-billion-parameter Mistral Large 3 base and instruction checkpoints under Apache 2.0 with API and multi-platform access.
NVIDIA and AMD agree to share China-chip revenue with US government
NVIDIA and AMD agreed to give the US government 15 percent of revenue from specified AI-chip sales to China in exchange for export licenses.
United States assures NVIDIA that H20 export licenses for China will be granted
NVIDIA said it was applying to resume H20 accelerator sales in China after the US government assured the company that licenses would be granted, reversing the practical effect of April's access restriction.
Mistral announces sovereign AI cloud with tens of thousands of GPUs
Mistral announced Mistral Compute, an integrated sovereign AI cloud planned around tens of thousands of NVIDIA GPUs and private stacks outside dominant U.S. providers.
OpenAI launches one-gigawatt Stargate UAE cluster
OpenAI announced a one-gigawatt Abu Dhabi Stargate cluster with G42, Oracle, NVIDIA, Cisco and SoftBank, plus nationwide ChatGPT access and reciprocal UAE investment in US infrastructure.
NVIDIA and HUMAIN plan 500-megawatt Saudi AI factories
NVIDIA and HUMAIN announced AI factories using several hundred thousand advanced GPUs over five years, beginning with an 18,000-unit GB300 supercomputer and physical-AI infrastructure.